
STAUFF 800 LPM FLOW TESTER DIGITAL
# Price only valid for August 2022!!#
This hydraulic flow testing unit is used for measuring the flow rate of fluids in mobile and industrial hydraulics. It is designed with a loading valve for the strain test of the hydraulic system to facilitate precise control of the operating pressure. Suitable for 10-800 LPM , Max.: 480 bar (7,000 psi), Max.: 110 °C (230 °F)
Webtec now offers its DHM 404 and 804 digital hydraulic multimeters that use Bluetooth Smart (v4.0) to communicate with mobile phones and tablets running iOS and Android operating systems. The portable instrument produces electronic reports that can be emailed to recipients. It records and saves up to 12 sets of data points to its internal memory. All models are powered by a standard 9-V battery that normally provides more than six months of testing time.
The portable instrument has four screens that can be toggled by a panel button. The initial screen shows to display digital flow, pressure, peak pressure, temperature, and power with an update time of 0.7 sec. A second screen shows the same parameters, plus bar graphs. A third screen also displays volumetric efficiency as a percentage of the set point recorded on command. A fourth screen reviews data of all logged points. Recorded data can be retrieved from the meter with a Bluetooth-enabled device running the Webtec’s App.
CALIBRATION CERTIFICATE; this certificate is an optional extra. Unit needs to be calibrated & recorded at Stauff NSW Head office. Please allow 2 weeks for this procedure. This is an additional cost.
Features
▪ Suitable for Mineral Oil (Aluminium), HFC Fluids. Not suitable for water.
Bi-Directional, preferred direction (more accurate) as per arrows.
▪ Designed for in-line installation
IMPROPER SELECTION, INSTALLATION, IMPLEMENTATION AND/OR OPERATION BY ANYONE OTHER THAN PERSONS WITH APPROPRIATE TECHNICAL AND MECHANICAL TRAINING CAN RESULT IN DAMAGE TO EQUIPMENT OR PROPERTY, SERIOUS PERSONAL INJURY OR DEATH. PROPER PRECAUTIONS AND SAFETY PROCEDURES SHOULD BE IMPLEMENTED PRIOR TO INSTALLATION AND OPERATION OF EQUIPMENT.
$RL 082022
RE01032023$