
| Quantity | Price per item | Discount |
| 5 items | AU$496.54 | 5% off |
| 10 items | AU$470.40 | 10% off |
| 25 items | AU$457.34 | 12% off |
| 50 items | AU$444.27 | 15% off |
A priority flow control takes one pump flow and guarantees a set amount to the priority function first, sending whatever is left over to the secondary circuit. Steering is the classic case: the steering orbital always gets its flow, and the implement gets the remainder.
These are modular sandwich plates. They bolt between the subplate and the directional valve in a Cetop stack, so the priority function is built into the valve assembly rather than plumbed separately — no extra hoses, no extra ports, nothing to leak.
| Part number | Size | Priority on | Notes |
| RFP50FC3B01 | Cetop 3 (NG6) | B port | 01 spring |
| RFP50FC3B02 | Cetop 3 (NG6) | B port | 02 spring |
| RFP50FC3B03 | Cetop 3 (NG6) | B port | 03 spring |
| RFP50FC3VU02A | Cetop 3 (NG6) | A port | With check, 02 spring |
| RFP50FC3VU03A | Cetop 3 (NG6) | A port | With check, 03 spring |
| RFP90FC5AA | Cetop 5 (NG10) | A port | Intermediate valve |
| RFP90FC5PA | Cetop 5 (NG10) | P port | Priority flow control |
Bolt kits are not included. A modular stack needs longer bolts than a valve mounted straight to the subplate — add one bolt kit per stack, sized for the total stack height.
Manufactured by CBF Hydraulic, Montecchio Maggiore, Italy.